偉肯電氣婁封新工廠工程 (071112)

 海洛斯動(dòng)態(tài)    |      2012-01-01

Our company had completed the design and construction of air-conditioning engineering with good quality for new plant (Area: 25000 square meters. Using lithium bromide absorption host, the whole system is design with variable air volume, variable water, timely central control and network remote monitoring).

http://www.youxilaile.cn